{"id":445,"date":"2023-06-05T15:10:13","date_gmt":"2023-06-05T14:10:13","guid":{"rendered":"http:\/\/evfr.org.uk\/?p=445"},"modified":"2023-06-05T17:17:16","modified_gmt":"2023-06-05T16:17:16","slug":"cracking-on","status":"publish","type":"post","link":"https:\/\/evfr.org.uk\/?p=445","title":{"rendered":"Cracking on !"},"content":{"rendered":"<p><em>Hi there, well we have surprised ourselves again as we have really got into the creation of our longer, layby, passing loop, with a vengeance&#8230;Peter and Brian got things started whilst John and Keith were away, by breaking out the concrete crossing , phew, hard was it ? yes !!! <\/em><\/p>\n<figure id=\"attachment_449\" aria-describedby=\"caption-attachment-449\" style=\"width: 169px\" class=\"wp-caption alignleft\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-449 size-medium\" src=\"https:\/\/evfr.org.uk\/wp-content\/uploads\/20thMayPeterconcxingremoval-1-169x300.jpg\" alt=\"\" width=\"169\" height=\"300\" srcset=\"https:\/\/evfr.org.uk\/wp-content\/uploads\/20thMayPeterconcxingremoval-1-169x300.jpg 169w, https:\/\/evfr.org.uk\/wp-content\/uploads\/20thMayPeterconcxingremoval-1-576x1024.jpg 576w, https:\/\/evfr.org.uk\/wp-content\/uploads\/20thMayPeterconcxingremoval-1-768x1365.jpg 768w, https:\/\/evfr.org.uk\/wp-content\/uploads\/20thMayPeterconcxingremoval-1-864x1536.jpg 864w, https:\/\/evfr.org.uk\/wp-content\/uploads\/20thMayPeterconcxingremoval-1.jpg 1125w\" sizes=\"auto, (max-width: 169px) 100vw, 169px\" \/><figcaption id=\"caption-attachment-449\" class=\"wp-caption-text\">concrete crossing removed !<\/figcaption><\/figure>\n<figure id=\"attachment_447\" aria-describedby=\"caption-attachment-447\" style=\"width: 300px\" class=\"wp-caption alignright\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-447 size-medium\" src=\"https:\/\/evfr.org.uk\/wp-content\/uploads\/Newtrackfromcocxing24thMay-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/evfr.org.uk\/wp-content\/uploads\/Newtrackfromcocxing24thMay-300x169.jpg 300w, https:\/\/evfr.org.uk\/wp-content\/uploads\/Newtrackfromcocxing24thMay-1024x576.jpg 1024w, https:\/\/evfr.org.uk\/wp-content\/uploads\/Newtrackfromcocxing24thMay-768x432.jpg 768w, https:\/\/evfr.org.uk\/wp-content\/uploads\/Newtrackfromcocxing24thMay-1536x864.jpg 1536w, https:\/\/evfr.org.uk\/wp-content\/uploads\/Newtrackfromcocxing24thMay.jpg 2000w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-447\" class=\"wp-caption-text\">New track sections laid in to start the new curve<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><em>Then John has been making up track sections, so we took out the layby entry point and installed a straight so we can keep running trains, <\/em><\/p>\n<figure id=\"attachment_461\" aria-describedby=\"caption-attachment-461\" style=\"width: 169px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-461 size-medium\" src=\"https:\/\/evfr.org.uk\/wp-content\/uploads\/Keithchieftain24thMaytesting-new-starigh-atLatby-169x300.jpg\" alt=\"\" width=\"169\" height=\"300\" srcset=\"https:\/\/evfr.org.uk\/wp-content\/uploads\/Keithchieftain24thMaytesting-new-starigh-atLatby-169x300.jpg 169w, https:\/\/evfr.org.uk\/wp-content\/uploads\/Keithchieftain24thMaytesting-new-starigh-atLatby-576x1024.jpg 576w, https:\/\/evfr.org.uk\/wp-content\/uploads\/Keithchieftain24thMaytesting-new-starigh-atLatby-768x1365.jpg 768w, https:\/\/evfr.org.uk\/wp-content\/uploads\/Keithchieftain24thMaytesting-new-starigh-atLatby-864x1536.jpg 864w, https:\/\/evfr.org.uk\/wp-content\/uploads\/Keithchieftain24thMaytesting-new-starigh-atLatby.jpg 1125w\" sizes=\"auto, (max-width: 169px) 100vw, 169px\" \/><figcaption id=\"caption-attachment-461\" class=\"wp-caption-text\">Keith and Chieftain testing the new straight track that replaced the layby entrance point<\/figcaption><\/figure>\n<p><em>Then we started to dig out for the new track base, which was going to take a while !!! (we are not as fit as we were !!!!) , so Ben borrowed his mate&#8217;s digger and did it for us over the Bank Holiday weekend, which is a fantastic help, thanks Ben.<\/em><\/p>\n<figure id=\"attachment_460\" aria-describedby=\"caption-attachment-460\" style=\"width: 169px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-460 size-medium\" src=\"https:\/\/evfr.org.uk\/wp-content\/uploads\/Newcuevretrackbedexcavated3June-2-169x300.jpg\" alt=\"\" width=\"169\" height=\"300\" srcset=\"https:\/\/evfr.org.uk\/wp-content\/uploads\/Newcuevretrackbedexcavated3June-2-169x300.jpg 169w, https:\/\/evfr.org.uk\/wp-content\/uploads\/Newcuevretrackbedexcavated3June-2-576x1024.jpg 576w, https:\/\/evfr.org.uk\/wp-content\/uploads\/Newcuevretrackbedexcavated3June-2-768x1365.jpg 768w, https:\/\/evfr.org.uk\/wp-content\/uploads\/Newcuevretrackbedexcavated3June-2-864x1536.jpg 864w, https:\/\/evfr.org.uk\/wp-content\/uploads\/Newcuevretrackbedexcavated3June-2-1152x2048.jpg 1152w, https:\/\/evfr.org.uk\/wp-content\/uploads\/Newcuevretrackbedexcavated3June-2-scaled.jpg 1440w\" sizes=\"auto, (max-width: 169px) 100vw, 169px\" \/><figcaption id=\"caption-attachment-460\" class=\"wp-caption-text\">New trackbed by Ben !<\/figcaption><\/figure>\n<p style=\"text-align: left;\"><em>So some new track is now laid in position and looks good, so we\u00a0 can now get on with the edging, lay some membrane and get some under track ballast down to get the track level right, fantastic , we are well impressed!\u00a0<\/em><\/p>\n<p><em><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-462 aligncenter\" src=\"https:\/\/evfr.org.uk\/wp-content\/uploads\/20230603_113420-2-169x300.jpg\" alt=\"\" width=\"169\" height=\"300\" srcset=\"https:\/\/evfr.org.uk\/wp-content\/uploads\/20230603_113420-2-169x300.jpg 169w, https:\/\/evfr.org.uk\/wp-content\/uploads\/20230603_113420-2-576x1024.jpg 576w, https:\/\/evfr.org.uk\/wp-content\/uploads\/20230603_113420-2-768x1365.jpg 768w, https:\/\/evfr.org.uk\/wp-content\/uploads\/20230603_113420-2-864x1536.jpg 864w, https:\/\/evfr.org.uk\/wp-content\/uploads\/20230603_113420-2-1152x2048.jpg 1152w, https:\/\/evfr.org.uk\/wp-content\/uploads\/20230603_113420-2-scaled.jpg 1440w\" sizes=\"auto, (max-width: 169px) 100vw, 169px\" \/><\/em><\/p>\n<p><em>Four of us , including old Ray who is now in a Care Home at Stalham bless him, had a ride over to Hemsby for their Parklands week on Wednesday and enjoyed the variety of locos that were out and about, catching up with some old friends, and enjoying some refreshments, another great week, well done the Parkland Boys and Girls.<\/em><\/p>\n<p><em><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-451\" src=\"https:\/\/evfr.org.uk\/wp-content\/uploads\/31stMayPeterKeithHemsbyy-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/evfr.org.uk\/wp-content\/uploads\/31stMayPeterKeithHemsbyy-300x169.jpg 300w, https:\/\/evfr.org.uk\/wp-content\/uploads\/31stMayPeterKeithHemsbyy-1024x576.jpg 1024w, https:\/\/evfr.org.uk\/wp-content\/uploads\/31stMayPeterKeithHemsbyy-768x432.jpg 768w, https:\/\/evfr.org.uk\/wp-content\/uploads\/31stMayPeterKeithHemsbyy-1536x864.jpg 1536w, https:\/\/evfr.org.uk\/wp-content\/uploads\/31stMayPeterKeithHemsbyy-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/em><\/p>\n<p><em><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-452 alignright\" src=\"https:\/\/evfr.org.uk\/wp-content\/uploads\/31stMayPetrRayHemsby-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/evfr.org.uk\/wp-content\/uploads\/31stMayPetrRayHemsby-300x169.jpg 300w, https:\/\/evfr.org.uk\/wp-content\/uploads\/31stMayPetrRayHemsby-1024x576.jpg 1024w, https:\/\/evfr.org.uk\/wp-content\/uploads\/31stMayPetrRayHemsby-768x432.jpg 768w, https:\/\/evfr.org.uk\/wp-content\/uploads\/31stMayPetrRayHemsby-1536x864.jpg 1536w, https:\/\/evfr.org.uk\/wp-content\/uploads\/31stMayPetrRayHemsby-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hi there, well we have surprised ourselves again as we have really got into the creation of our longer, layby, passing loop, with a vengeance&#8230;Peter and Brian got things started whilst John and Keith were away, by breaking out the concrete crossing , phew, hard was it ? yes !!! &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-445","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/evfr.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/445","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/evfr.org.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/evfr.org.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/evfr.org.uk\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/evfr.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=445"}],"version-history":[{"count":12,"href":"https:\/\/evfr.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/445\/revisions"}],"predecessor-version":[{"id":483,"href":"https:\/\/evfr.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/445\/revisions\/483"}],"wp:attachment":[{"href":"https:\/\/evfr.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=445"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/evfr.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=445"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/evfr.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=445"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}