Well we have been quite busy this month dodging the showers, nevertheless, excellent progess has been made on our extended layby loop. The track is all laid now,connected and laid more or less to level. We have put the top ballast layer on the outside and between the rails, but we have had to leave the side next to the timber edging until we have laid in the signalling and track sensor cables. 
       Track ballasting in progress

After much deliberation and measuring on site, we ordered  6 x100m drums which we hope will be enough ! The cables arrived on Saturday afternoon so we can now lay these in and complete the track ballast and final tamping and levelling, ready for running.

 

 

The tractor crossing was concreted on Wednesday too…While all this has been going on, the usual gardening work continues as nature don’t not stop things growing!!!!
            The EVFR A1 concreting Gang!!!

Kevin made a visit too and it was good to see him out and about again.
Richard,s Happy now that the tractor's back!