Trackwork tweaking
Following our testing the locos through the points in the opposite direction to the usual running, we needed to adjust a couple of checkrails as Viceroy with its 3 axles was tending to fall off! So we adjusted the passing siding point as you enter from the station end, and the 3 way in the […]
New Tractor crossing
Saturday 17th July saw the new tractor crossing concreted , mainly by Ben and John, with some bush trimming also taking place along the ‘layby siding’ that was , by Peter and Brian, a good day’s work , especially in the lovely hot sun !!!!!!! j
More progress on the new station passing loop
July 3rd saw more good progress on installing the second point and associated main line track to form the new station area. John, Peter, Andrew and Brian were pleased with the result. It only now remains to install the track sections connecting the two new points and it will be ready for us to try […]