November update
Hi there
Well how time flies, can’t believe its almost December and that means another year nearly gone ! But it’s been a very good year on our railway with plenty going on and a very warm and friendly atmosphere with everyone involved. So in anticipation of some cold weather as winter draws near, we have drained ‘Bronwyn’ and ‘Isabel’, moving them up into the workshop area where they are tucked up under quilts to keep them cosy. ‘Prospero’ is also cleaned down and drained ready to move to join the other steam locos over the Winter.
‘Bronwyn’ and ‘Isabel’ tucked in
Thomas and Kevin working on Prospero’
The station benches, seats , and fencing have all been moved into the carriage shed.
Work continues on the signalling project with the ‘Raspberry Pi’ fitted into the control cabinet in the carriage shed, and another signal post is now concreted in position alongside the anticlockwise headshunt track .
Another track detection section has also been wired in on the clockwise track here.
JP with BB supervising the wiring to a track detection track section